IPSTAR modem configuration
This post is for telecom or network engineers. In this post I am providing detail for iUAT version 1.13 installation and user manual. This ipstar make vsat is used for both Bank and GSM sites. I have used this to operate GSM site. I am listing the steps of the configuration.
RUNNING IUAT PROGRAM FOR UT INSTALLATION
Step 1. Authentication
At first you will be asked to enter the 6 digit pin code of your location.
Selecting location a dialoge box containing " Are you using the 10m reference cable" will be displayed select No to proceed installation with actual cable.
Step 2. specify the ODU information
Specify the antenna and ODU Information as required.
Then click next to continue.
Terminal connecting
Specify the user terminal IP Address and logon power then click "Next" to continue.
The iUAT process will be started within 70 seconds, It will connect to the user terminal.
Step 4. Antenna alignment
This dialog shows the current toll signal strength (Rx level ) maximum signal strength attained, Toll Es/no, Beam ID and frequency ID.
At this point you should try to adjust the antenna alignment (Azimuth, Elevation, Polarization) to reach the maximum Toll Es no. After this click next.
Step 5. Searching for available frequency
The iUAT will search for the best available Toll frequency.
Step 6. Transmitted power calibration
The iUAT program will continue to step 6 to calibrate the transmitted power.
Step 7. Polarization alignment
At this point you need to adjust the antenna polarization to match with the transmission from satellite. After finished click Next to continue to step 8.
Step 8. UAT Quality control
At this point you will be asked to submit the test results to the UAT QC process click yes to submit the result to the QC.
Thanks for visiting.
Thanks for visiting.
hi,
ReplyDeletecan you post a link to download iuat 1.13
This is the link for iuat 1.14 http://203.175.112.196/websale/ipstar/intswdownload.asp
ReplyDelete